Réalisations

Fabrication and installation of a custom temporary structure for an annual maintenance shutdown at a mining site in the Malartic area.

Refurbishment of a mining hammer carried out during a planned shutdown, including targeted work to optimize the performance and durability of the equipment.

Coordination, lifting plan design, on-site supervision, and anchor point fabrication for your underground and confined space mining lifting projects.

Reconditioning of a mining dust collector, including the modernization and optimization of this critical installation to improve ventilation and filtration performance.

Design, fabrication, and installation of a 2-ton overhead crane and a custom-built modular door for an industrial project in the forestry sector.

Implementation of a production line in the food sector, coordinating a project lasting over 10 months, involving 10 trades, and a tandem lift of 120,000 lbs in a confined space, under electrical wires.

Project management and full coordination of the work for the implementation of new loading bays, ensuring compliance with technical requirements and deadlines.

Design, fabrication, and installation of multiple ladder platforms on a concrete silo, ensuring secure and efficient access for maintenance operations.